Updating...
QUICK LINKS
Chat with OIT
OIT Homepage
ATEC Homepage
Research Homepage
Galaxy
eLearning
Directory
Maps
Technician Login
•
SITE MAP
Skip to main content
Filter your search by category. Current category:
All
All
Knowledge Base
Service Catalog
Search the client portal
Search
Sign In
Show Applications Menu
Atlas Portal
Sign In
Search
Home
IT Support
Services
Knowledge Base
More Applications
Skip to Knowledge Base content
Search
Articles
Blank
Knowledge Base
Research Support
Data Management
Data Collection
REDCap
Create a New REDCap Project
Create a New REDCap Project
Tags
REDCap
How-to: Create a New REDCap Project
Navigate to
https://redcap.utdallas.edu
and log-in using your NetID and password.
Create a new project by clicking "
+New Project
"
.
Enter the following relevant project information
Project Title
Project’s Purpose
Practice/Just for fun
Operational Support
- This option should be used if the new project will support standard operations such as surveying participants availability to complete an in-person assessment.
Research
– This option should be used if the new project is associated with an IRB study (Note: For Research, you must fill out administrative details such as P.I., email, IRB number, type of research, etc.)
Quality Improvement
- This option should be used if the new project is designed to improve processes such as a survey assessing student and staff's satisfaction with the Core Facilities scheduling process.
Other
- This option should be used if no option above fits the scope of the project
Project
Notes
Project Creation Option
Empty Project (Blank slate)
Upload a REDCap project xml file (CDISC ODM format)
Use a template (choose one below)
– Note there are IRB Templates built out to more quickly assist IRB related projects.
Click
Create Project
at the bottom of your screen.
The project’s Project Setup page should appear. For more information on what settings are found on the Project Setup page, visit this article:
_____________
.
Sign in to leave feedback
0 reviews
Blank
Blank
Blank
Blank
Print Article
Details
Article ID:
1056
Created
Wed 3/8/23 10:16 AM
Modified
Wed 8/30/23 11:18 AM
Related Articles (6)
REDCap Instrument Management
Instrument Management includes creating new instruments and renaming, copying and deleting existing instruments.
REDCap Longitudinal Data Collection
Instructions on how to set up Longitudinal Data Collection in REDCap
REDCap Online Designer
Describes the Instrument Management, Survey Settings, and other features found on the Online Designer
REDCap Project Setup Settings
Describes the project-level customizations found on the Project Setup page
REDCap Project Status
Describes the different REDCap Project Status'
REDCap Repeating Instruments
Instructions on how to set up Repeating Instruments and Repeating Events in REDCap
Deleting...
×
Share
Recipient(s)
- separate email addresses with a comma
Message
Press Alt + 0 within the editor to access accessibility instructions, or press Alt + F10 to access the menu.
Check out this article I found in the Atlas Portal knowledge base.<br /><br /><a href="https://atlas.utdallas.edu/TDClient/30/Portal/KB/ArticleDet?ID=1056">https://atlas.utdallas.edu/TDClient/30/Portal/KB/ArticleDet?ID=1056</a><br /><br />Create a New REDCap Project<br /><br />Instructions on how to create a new REDCap Project